Beautiful buildings. Frustrating signal.
Cubo’s Manchester sites at The Lincoln and No1 Spinningfields offered stunning design and high-performance materials – but those same energy-efficient features blocked mobile signals. Members experienced dropped calls and weak coverage that disrupted hybrid working and risked undermining Cubo’s premium member experience.
Fully funded. Fully managed. Future-ready.
Shared Access designed and delivered bespoke multi-operator mobile systems across both sites – installed discreetly, with zero disruption to members.
Strong, consistent coverage for all UK operators.
24/7 monitoring, maintenance and support.
Delivered on an OpEx model – no upfront cost for Cubo.
Flawless signal. Happier members. Stronger performance.
Both Cubo Manchester locations now deliver perfect mobile coverage and improved data speeds throughout – enhancing productivity and boosting member satisfaction.
Eliminated connectivity frustrations.
Improved member retention.
Strengthened Cubo’s commercial performance and competitive edge.
Connectivity that scales with ambition.
With flawless connectivity now standard, Shared Access is supporting Cubo’s rapid UK expansion – ensuring every new site offers the same premium digital experience members expect.
Read our full case study here.