Back to Our Case Studies

Cubo + Shared Access: Delivering flawless connectivity for modern workspaces

Beautiful buildings. Frustrating signal.

Cubo’s Manchester sites at The Lincoln and No1 Spinningfields offered stunning design and high-performance materials – but those same energy-efficient features blocked mobile signals. Members experienced dropped calls and weak coverage that disrupted hybrid working and risked undermining Cubo’s premium member experience.

Fully funded. Fully managed. Future-ready.

Shared Access designed and delivered bespoke multi-operator mobile systems across both sites – installed discreetly, with zero disruption to members.

  • End-to-end design and delivery.
  • Strong, consistent coverage for all UK operators.

  • 24/7 monitoring, maintenance and support.

  • Delivered on an OpEx model – no upfront cost for Cubo.

Flawless signal. Happier members. Stronger performance.

Both Cubo Manchester locations now deliver perfect mobile coverage and improved data speeds throughout – enhancing productivity and boosting member satisfaction.

  • Eliminated connectivity frustrations.

  • Improved member retention.

  • Strengthened Cubo’s commercial performance and competitive edge.

Connectivity that scales with ambition.

With flawless connectivity now standard, Shared Access is supporting Cubo’s rapid UK expansion – ensuring every new site offers the same premium digital experience members expect.

Read our full case study here.

 

Our Case Studies

Ruiz Picasso 11, Madrid

20 Fenchurch Street, London

1 Causeway Park, Staines-Upon-Thames

National Gallery, London.

STATE OF THE ART TOWER AT HEATHROW

Tyne Tunnel